Wegenast Valley Erosion Control Project

Brampton

Greck was retained by the TRCA and The City of Brampton to address erosion risk for a pedestrian footbridge along the Etobicoke Creek Trail.


Greck was the lead consultant involved with overseeing the design and construction to repair the bridge abutments and stabilizing the bank to  prevent future impacts to the bridge and trail system. Armourstone, vegetated boulder revetment and brush layering were the techniques used to meet the needs of this project.