Redelmier Pond Decommissioning
Vaughan
After design, public consultation and construction, Redelmeier Pond is finally taking its new form. Greck worked alongside the TRCA to provide the design and construction inspection expertise required to remove the existing dam and reinstate this long standing manmade pond back into a natural watercourse.
Doing so will restore habitat for fish and wildlife in the Upper Don, improve opportunities for public access, outdoor recreation and stewardship and reduce overall risk of dam failure and flooding.