Newmarket GO

Newmarket

Greck was retained by to prepare an Erosion and Sediment Control (ESC) Plan for a concrete tie replacement project that spanned 500m of Metrolinx track through the Newmarket GO Train Station.  

 

Services included undertaking a detailed topographic survey using Total Station and GPS/GNSS  equipment and the preparation of design drawings followed by construction inspection.  