top of page
Metrolinx / Verdi Alliance Drainage Improvement
Mississauga
Greck was retained to provide the detailed design of the north drainage ditch within the GO- Metrolinx Lakeshore railway easement. The initial objective was to redirect flows in an existing poorly defined ditch to a westerly watercourse. These works were required for the proposed abandonment of a culvert system located within the drainage ditch.
Greck identified a more cost-effective alternative solution which diverted flows to an existing City of Mississauga storm trunk sewer. Greck worked with and obtained approvals for these works from the City of Mississauga and Region of Peel. Deliverables included detail design drawings and supporting design brief.
bottom of page