top of page
Check The Project

Hillsburgh Dam Decommissioning

Erin

Greck provided planning, design, analysis and construction inspection services for a private landowner to partially decommission an online pond within the West Credit river.


Our scope of work included a detailed bathymetric and topographic survey, review of all relevant technical data and existing reports/studies, development of three alternative dam decommissioning concepts, hydraulic analysis to assess the concept options, detailed design plans incorporating ESC management and site restoration and construction management.


All works were approved by the local regulatory authorities and permits for construction were obtained by Greck.

bottom of page