top of page
Cooksville Creek Trunk Sewer Replacement
Mississauga
Greck completed a detailed hydrologic and hydraulic analysis of a 2700mm storm trunk sewer system, approximately 600m long and servicing a dense commercial and residential area. The analyses were completed with PCSWMM and included the redesign of a new replacement sewer system.
We prepared detail design plans and obtained regulatory approvals for the replacement sewer system. Construction inspection services were completed over the project works.
bottom of page