top of page
Check The Project

Cooksville Creek Trunk Sewer Replacement

Mississauga

Greck completed a detailed hydrologic and hydraulic analysis of a 2700mm storm trunk sewer system, approximately 600m long and servicing a dense commercial and residential area.  The analyses were completed with PCSWMM and included the redesign of a new replacement sewer system.


We prepared detail design plans and obtained regulatory approvals for the replacement sewer system.  Construction inspection services were completed over the project works.

PEO ScarbChapter Logo Transparent BG 2 i
EGBC-logo-dark.png

Copyright © 2025 Greck and Associates Limited.

bottom of page