top of page
Check The Project

Woodside Estates Subdivision

Forest

Greck was retained to provide specialized water resources engineering services for the detail design of a stormwater management facility and natural channel.


The proposed development included a multi-phase residential development that required stormwater quantity and quality control as well as design considerations for an existing watercourse on the property.


Detailed design drawings were prepared for the pond facility and natural channel with supporting documentation and stormwater management report in accordance with municipal and provincial requirements and local regulatory authority approvals.

bottom of page