arrow&v

Newmarket GO

Greck was retained by PNR through as sub-consultant to prepare an Erosion and Sediment Control (ESC) Plan for a concrete tie replacement project that spanned 500m of Metrolinx track through the Newmarket GO Train Station.  

 

Services included a detailed survey and the preparation of design drawings as well as construction inspection to document and ensure correct execution.  Greck undertook the topographic survey for the client utilizing Total Station and GPS/GNSS surveying equipment.

 
Services

Urban Drainage and Stormwater Management