Greck was retained by PNR through a subconsultant to prepare an Erosion and Sediment Control (ESC) Plan for proposed concrete tie replacement works spanning 500m of Metrolinx track adjacent to the Newmarket GO Train Station.  

 

The project undertaken included a detailed survey and the preparation of detailed design drawings as well as construction inspection to document and ensure correct execution.  Greck undertook the topographic survey for the client using Total Station and GPS/GNSS surveying equipment.

 
Services

Urban Drainage and Stormwater Management