top of page
arrow&v
Check The Project

Cooksville Creek Trunk Sewer Replacement

Mississauga

Greck completed a detailed hydrologic and hydraulic analysis of a 2700mm storm trunk sewer system, approximately 600m long and servicing a dense commercial and residential area.  The analyses were completed with PCSWMM and included the redesign of a new replacement sewer system.


We prepared detail design plans and obtained regulatory approvals for the replacement sewer system.  Construction inspection services were completed over the project works.

bottom of page