arrow&v

Automall Industrial Development

Greck were retained by the developer to undertake a water balance study for a proposed industrial development in Whitchurch Stouffville, Ontario.  A detailed analysis was undertaken using local precipitation data and geological information to determine existing infiltration characteristics and preferred stormwater management solution.  Deliverables included detailed design drawings for the construction of two roof water infiltration facilities with a supporting design brief summarizing our technical analysis.  Greck worked together with the conservation authority, muncipality and other retained consultants to implement the Low Impact Development solution. 

 
Services

Land Development