arrow&v

Automall Industrial Development

Greck were retained by the developer to undertake a water balance analysis for a proposed industrial development in Whitchurch Stouffville, Ontario.  A detailed analysis was undertaken using local precipitation data and geological information to determine existing and proposed infiltration characteristics.  Deliverables included detailed design drawings for the construction of two roof water infiltration facilities with a supporting design brief.  Greck worked together with regulating agencies and other retained consultants to prepare the Low Impact Development solution to accommodate the proposed site plan in accordance with provincial and conservation authority policies and guidelines. 

 
Services

Land Development

Urban Drainage and Stormwater Management