arrow&v

Automall Industrial Development

Greck were retained by the developer to undertake a water balance analysis for a proposed industrial development in Whitchurch Stouffville, Ontario.  A detailed analysis was undertaken using local precipitation data and geological information to determine existing infiltration characteristics ultimate stormwater management solution.  Deliverables included detailed design drawings for the construction of two roof water infiltration facilities with a supporting design brief.  Greck worked together with regulating agencies and other retained consultants to prepare the Low Impact Development solution. 

 
Services

Land Development

Urban Drainage and Stormwater Management